-
Union Power Minister R K Singh virtually inaugurated the diversion of Marusudar River of Pakal Dul Hydro Electric Project in Kishtwar.
-
Project is being constructed by Chenab Valley Power Projects pvt Limited(CVPPPL)
-
Has been entrusted with 3,094 MW hydro power project for construction in Jammu and Kashmir
-
Fulfilling the target of 450 GW Renewable energy by 2030